VP Logisztika KFT. was formed in 1994. For more than 20 years our main profile was domestic road forwarding services. After a change in ownership in 2020 new services were introduced, therefore our scope of activities expanded. As a result, our offer for services was supplemented by operating a new site, where we offer warehouses to rent, as well as carrying out the loading and unloading of various goods onto/from railway carriages.
The Enterprise Park is located in the western part of Nyíregyháza directly next to the western bypass road of the M3 motorway. This part of the city is an industrial area thus a great number of commercial, manufacturing and other industrial companies operate in close vicinity of the site operated by VP Logisztika Kft.
A project was aimed at constructing a small-scale solar power plant in order to install an environmentally friendly, economically viable system to provide renewable energy thus reducing the demand for electric energy from the grid. The solar cells were placed on the sheet roof of the building facing south. The output of the solar cell system is 225.34kW while the connected performance is 189kW, the solar cell panels connect to the AC distribution box and the existing electric network via the inverter. The direct long-term aims of the project are to reduce operating costs and achieve a heightened sense of comfort. The indirect long-term objectives of the project are primarily to reduce the emission of greenhouse gases and decrease the usage of fossil fuel resources thus contributing to the national goals of increased usage of renewable energy resources.
Located at 132-136 Derkovits utca, Nyíregyháza in an industrial zone with good accessibility, industrial properties ranging from 50m2 to 2000m2 are available for lease. Our enterprise park has developed infrastructure, access to renewable energy, an asphalt-covered road network, outside lighting, fenced areas and 24/7 gate-keeping.
With our domestic forwarding services we are ready to serve our clients with IVECO make trucks and MEGA LIGHT trailers.
On our industrial railroad we carry out loading and unloading of goods. The industrial railroad is №100 and directly connects to the national core network at Nyíregyháza railway station on the freight station side, which is part of the trans-European freight rail network. Due to the favourable location, it is continuously operable since, firstly, the main line is not crossed, secondly, towing facility is provided on the premises. On request, (un)loading can be carried out even after nightfall thanks to outside lighting. The allowed axle load is 210kN. The site is easily accessible on road, arriving trucks enjoy a proper size of loading area.
Requirements:
Advantage:
What we offer: